Online Induction Portal

Loading

Georgiou_Civil-Slider-01
Georgiou_Civil-Slider-02
Georgiou_Civil-Slider-03
Georgiou_Civil-Slider-04

Civil

Georgiou has extensive experience in the planning, mobilisation and logistical management of resources to develop infrastructure in metropolitan and remote areas. Our sound project management systems for safety, quality, environmental and risk mitigation ensure a seamless transition between project phases, providing excellent outcomes at final completion.

Encompassing a complete design management capability, our commitment to efficiency and innovation in managing complex projects is underpinned by our experienced and well resourced team.

With the benefit of owning and managing more than 800 plant items, we can easily and readily undertake any degree of forward works required on site.


 

Ellenbrook Water Storage Tank

CLIENT:  DEPT. TRANSPORT AND MAIN ROADS
LOCATION:  ELLENBROOK, WA
DURATION:  JAN 2017 - DEC 2017
CONTRACT VALUE:  14M

Valued at $14M, Georgiou were awarded the design and construct contract for the Ellenbrook Water Storage Tank and asociated works for Water Corporation.

The project involves the construction an 80 million litre capacity water storage tank to support projected growth in Ellenbrook and the north eastern metropolitan corridor.

The water tank will be largest concrete tank Georgiou and the Water Corporation have ever constructed, measuring approximately 90 metres in diameter and 14 metres in height.

Delivered jointly by our Infrastructure and Engineering business units, the project also involves clearing, topsoil stripping and cut-to-fill earthworks.

Warrego Highway

CLIENT:  DEPT. TRANSPORT AND MAIN ROADS
LOCATION:  CHARLTON, QLD
DURATION:  MAR 2017 - FEB 2018
CONTRACT VALUE:  53M

Georgiou were awarded the Warrego Highway Stage 2 project in February 2017, valued at circa $53M.

Located on Toowoomba’s western outskirts between Charlton and Kingsthorpe, the project involves duplication of the Warrego highway from Leesons Road to just west of the intersection with Kingsthorpe-Harden Road. 

The scope of works for the project involves construction of a new two-lane road parallel to the existing Warrego Highway with the new road serving as the eastbound lanes.

The project is the second stage of the Toowoomba to Oakey highway duplication and one of 15 projects funded under the $635M Warrego Highway Upgrade Program.

Scarborough Redevelopment

CLIENT:  MRA
LOCATION:  SCARBOROUGH, WA
DURATION:  JUN 2016 - FEB 2018
CONTRACT VALUE:  50M

Valued at circa $50 million, the Scarborough Beach Redevelopment will see Georgiou deliver a fresh new Scarborough Beach foreshore and create new attractions for families and visitors to enjoy.

Together with the City of Stirling, the MRA is delivering a total refresh of the iconic beachfront.

The scope of works for the redevelopment includes demolition, service and drainage installation, pavement construction, soft and hard landscaping works, carpark reconfiguration, construction of a new Surf Club and a number of other buildings.

The project team will also redevelop the public domain areas within Scarborough Beach between Manning Street and Brighton Road, spanning from the shop fronts to the edge of the beach.

The Forward Works package, which prepared the site for this next stage with landscaping, bulk earthworks and services relocation, was also delivered by Georgiou, valued at $3 million.

Tianqi Lithium Plant

CLIENT:  TIANQI AND MSP ENGINEERING
LOCATION:  KWINANA, WA
DURATION:  MAR 2017 - JUN 2018
CONTRACT VALUE:  15M

In November 2016, Georgiou’s Infrastructure unit was awarded the preliminary earthworks package for the Tianqi Lithium project in Kwinana WA, alongside Georgiou’s Building unit who were awarded both the ECI and D&C packages for the site.

In February 2017, Georgiou's Engineering unit were awarded the concrete works package, which includes detailed earthworks and reinforced concrete works for the project.

Both the preliminary earthworks and concrete packages are valued at $15M, and are due to be completed later this year.

The preliminary earthworks package was completed in late March 2017 by Georgiou's Infrastructure unit, whilst the Engineering unit mobiliseing to site in the same week to begin the concrete works which are due to be completed in November 2017.

The awarding of this project was the culmination of more than 10 months of engagement with Tianqi and MSP Engineering, with preliminary cost planning, technical advice, value engineering and staging advice being provided towards achieving Development Approval for the project.

The project, worth a total of $400M, will be WA’s first downstream lithium processing plant and will produce 24,000 tonnes of lithium hydroxide a year for the Chinese battery market.

Tinana Interchange Project

CLIENT:  DEPT. TRANSPORT AND MAIN ROADS
LOCATION:  TINANA, QLD
DURATION:  JULY 2016 - LATE 2017
CONTRACT VALUE:  18M

Traffic efficiency and road safety on the Bruce Highway is set to improve following the award of a roadworks contract to National construction company, Georgiou Group.  The $18 million project, initiated by the Queensland Government, will see the Bruce Highway interchange at Tinana undergo significant improvements in an effort to improve traffic management and safety and support Fraser Coast regional growth.

Changes to the Tinana Interchange include construction of a northbound off-ramp, relocation of the Three Mile Road intersection about 300m south of its current location, removing the southbound off-ramp to Gympie Road, upgrading the existing southbound on-ramp and incorporating a wide centre line treatment. Previous Bruce Highway projects completed by Georgiou Group are the realignment of the Walker Street intersection completed in 2013 and the Bruce Highway Flood Recovery Works from Kolan River to St Lawrence, which commenced in February 2014.

Works on the interchange will commence in August 2016 and are scheduled for completion late 2017. 

Perth CityLink Project

CLIENT:  MRA
LOCATION:  PERTH, WA
DURATION:  JUN 2016 - JAN 2017
CONTRACT VALUE:  10M

Georgiou is playing a key role in the revitalisation of Perth’s CBD after being awarded a services and works contract on the State Government’s Perth City Link Project. The $10 million contract, awarded by the Metropolitan Redevelopment Authority (MRA), includes landscaping, services and civil infrastructure works for Stage 2B and 3 of the project, which will reconnect the Perth CBD with Northbridge for the first time in 100 years and create a new mixed-use precinct.

The contract, which is due for completion in January 2017 and will involve a peak workforce of 60 personnel, will see Georgiou Group deliver works including:

  • removal and relocation of City of Perth CCTV security systems;
  • the realignment and construction of footpaths, kerb line and median strips to the new City of Perth (CoP) landscaping along Wellington Street and Roe Street;
  • construction of a new median island and associated street lighting foundations;
  • installation of new stormwater drainage; and
  • installation of new services and installation of temporary street lighting.

The Perth City Link contract award comes just weeks after Georgiou Group secured the Forward Works Package on another State Government flagship project - the Scarborough Beach Redevelopment, also being managed by the MRA.

 

 

 

Southport-Burleigh Road Upgrade

CLIENT:  TMR
LOCATION:  BROADBEACH WATERS, QLD
DURATION:  JAN 2016 - JUL 2016
CONTRACT VALUE:  6M

Georgiou is currently delivering the Southport – Burleigh Six Lane Upgrade Project situated approximately 3km west of the Gold Coast Highway in the suburb of Broadbeach Waters for the Department of Transport and Main Roads. The project involves upgrading the northbound and southbound carriageways from four-lanes to six-lanes. Work also includes two major signalised intersection upgrades which feature full pavement reconstruction, detailed signalised switching and services protection works.

The site extends from just south of Rudd Street heading north to Fremar Street along Southport Burleigh Road (Bermuda Street) over a distance of approximately 1.1km.

Scope includes:

  • public utility relocations & protection works;
  • two major intersection upgrades;
  • combination of full depth pavement and overlay pavement reconstruction;
  • drainage upgrades;
  • road lighting;
  • traffic signals;
  • two water main relocations to be completed under live traffic conditions; and
  • re-construction of driveways and a number of property adjustments.

Mandurah Bridge Upgrade

CLIENT:  MAIN ROADS WA
LOCATION:  MANDURAH, WA
DURATION:  JAN 2016 - LATE 2017
CONTRACT VALUE:  51.8M

Georgiou Group has secured the coveted $51.8 million Old Mandurah Traffic Bridge Replacement project.

Awarded by Main Roads WA, scope of works includes the decommissioning of the existing bridge and the design and construction of a new bridge over the Mandurah Estuary, including associated roadworks, public amenities and infrastructure. The bridge will improve vehicular capacity with two traffic lanes in each direction and safety for pedestrians and cyclists with separate, wider facilities over the bridge.

Georgiou will now move through a detailed design development and construction management planning phase before commencing work at the end of the first quarter of 2016.

Construction will be complete in late 2017, with peak personnel of 60.

Northern Road Stage 1

CLIENT:  ROADS AND MARITIME SERVICES
LOCATION:  NARELLAN/ORAN PARK, NSW
DURATION:  NOV 2015 - OCT 2017
CONTRACT VALUE:  57M

Roads & Maritime Services has awarded Georgiou Group a $57 million contract to construct the Northern Road Upgrade Stage 1 Project in NSW, due for completion in October 2017. This is the first contract award for our NSW office since opening in North Sydney in early 2015, and is a big plus for Georgiou’s expansion on the East Coast.

The project involves the construction of roadworks, bridge works, and associated activities to upgrade 3.3km Northern Road between Old Northern Road, Narellan, and Peter Brock Drive, Oran Park. Works include the conversion of the existing single lane carriageway to a two-lane dual carriageway with dedicated bus lanes, and the construction of two new 46.5 metrelong three-span bridges over Narellan Creek. 

The project is funded by the Australian and NSW Governments, and is part of the Western Sydney Infrastructure Plan, a 10-year road investment program.

Once complete, Northern Road will provide a range of benefits including:

  • improved safety for pedestrians, cyclists, and motorists;
  • improved travel times and increased capacity to accommodate future population growth and development needs in the area; and
  • improved access and travel times for road freight in Sydney’s south west.

For information regarding the environmental monitoring carried out on this project, click here.

Aurora Residential Estate

CLIENT:  LENDLEASE COMMUNITIES
LOCATION:  WOLLERT, VIC
DURATION:  OCT 2015 - ONGOING
CONTRACT VALUE:  20M

In October 2015, Georgiou were awarded the civil construction contract for Lendlease’s Aurora Residential Development in Wollert, VIC.

Scope of works included:

  • bulk earthworks, stripping and creek / waterway formation works;
  • construction of extension of Edgars Road, connecting to Craigieburn Road East;
  • construction of three culvert / bridge creek crossings;
  • construction of all internal roads and drainage;
  • installation of sewerage and water reticulation works;
  • hard and soft landscaping works; and
  • connection of electrical and telecommunication reticulation.

Key challenges on the project include: dust management due to the close proximity of the works to local residents, environmental controls and management of sensitive flora and fauna, and undertaking multiple stages concurrently to meet high production demand.

Through the unique open and collaborative approach between Georgiou, Lendlease and their design consultant, Beveridge Williams, potential issues with design and constructability have been raised and managed proactively, reducing costs and mitigating delays to the program.

CPA Remote Public Car Park

CLIENT:  BRISBANE AIRPORT CORPORATION PTY LTD
LOCATION:  BRISBANE AIRPORT, QLD
DURATION:  AUG 2015 - APR 2016
CONTRACT VALUE:  17M

The project involves the design and construction of an at-grade car park with the capacity for approximately 2,500 parking bays with associated external roads and services infrastructure with over 70,000m2 of pavement areas and includes the D&C of public shelters / bus stop buildings, electrical and security systems.

The CPA Remote Car Park (RPCP) is a long-term remote public car park located within the Central Parking Area at Brisbane Airport. The RPCP will service both the International and Domestic Terminal passengers via a bus service to each terminal.
The project is divided into two separable portions.

Separable Portion 1 involves the construction of:

  • construction of a minimum of 1,200 car park bays;
  • all associated service infrastructure required to operate the stage of the car park;
  • works to Ivy May Way;
  • installation of bus stop 2 & 3; and
  • southern car park entry / exit including cover structures.

Separable Portion 2 involves the construction of the balance of the remaining works, including:

  • construction of car park bays;
  • connection of services;
  • works on Road 5;
  • installation of Bus Stop 1; and
  • northern car park entry structure.

The project team successfully coordinated works alongside another Brisbane Airport Corporation contractor (bulk earthworks) to minimise disruption to the program during a staged handover of areas process. The new car park is a long-term remote public car park located within the Central Parking Area at Brisbane Airport. It will service both the International and Domestic Terminal passengers via a bus service to each terminal. 

Aubin Grove Train Station

CLIENT:  PUBLIC TRANSPORT AUTHORITY
LOCATION:  AUBIN GROVE, WA
DURATION:  MID 2015 - DEC 2016
CONTRACT VALUE:  105M

Georgiou Group is progressing with works on the new $105 million Aubin Grove train station and road upgrade, which is designed to cater for the growing communities in Perth’s southern suburbs.

The scope of work includes the construction of the multi-modal station, approximately 2000 car parking bays, six bus feeder services, bicycle facilities and passenger amenities. Georgiou is also working on the widening of Russell Road Bridge to cater for increased traffic associated with the new station.

Located in the median of the Kwinana Freeway, just north of Russell Road, the station will be operational in early 2017. Close to 4000 people are expected to board at the station each week day. 

 

Whitby Pump Station and Pressure Main

CLIENT:  GOLD FUSION
LOCATION:  WHITBY, WA
DURATION:  JUN 2015 - JAN 2016
CONTRACT VALUE:  3.5M

Georgiou recently completed the installation of a Type 10 Wastewater Pumping Station and Pressure Main at the Whitby Estate for client, Gold Fusion.

Scope of works includes: 

  • construction of approximately 5,315 m of OD180 PN12.5 PE100 pressure main from the temporary pumping station, running north through the development, a rail reserve and then along Soldiers Road;
  • construction of approximately 312 m of OD225 PN12.5 PE100 pressure main;
  • installation of associated valves and fittings necessary to direct wastewater through the modified network under normal operation and maintenance or emergency scenarios;
  • installation of a new Type 10 pumping station at the Whitby development to pump 13–16 L/s to existing access chamber AC8984 and installation of a new magnetic flowmeter, valves and discharge pipework associated with the pumping station; and
  • installation of a below ground passive odour control system at the pumping station.

East Swanson Dock Pavement Reconstruction

CLIENT:  PATRICK STEVEDORES
LOCATION:  WEST MELBOURNE, VIC
DURATION:  MAY 2015 - OCT 2015
CONTRACT VALUE:  2M

Georgiou were engaged by Patrick Stevedores to undertake a large scale pavement and drainage reconstruction project at Melbourne’s East Swanson Dock.

Scope of works included:

  • excavation of existing pavements and drainage for container storage and transport area at East Swanson Dock;
  • construction of new full depth heavy duty pavements;
  • installation and upgrade of site stormwater drainage pipe;
  • line marking and signage;
  • internal traffic management and coordination of vehicle and plant movements; and
  • nanagement of lighting and electrical assets.

Key challenges on the project included critical management of staging and construction access, and interface with adjacent port stevedoring operations. With the port in operation at all times, strict timeframes for site access and vehicle movements were put in place. Georgiou was able to undertake the works to a tight programme and in conjunction with 24/7 Port operations, ensuring no delay to the works while finishing to an exceptional standard.

 

Essendon Fields Auto Centro

CLIENT:  ESSENDON FIELDS
LOCATION:  ESSENDON, VIC
DURATION:  JUL 2015 - DEC 2015
CONTRACT VALUE:  8M

In April 2015, Georgiou was awarded an $8 million contract to construct an extension to the Auto Centro Industrial Subdivision Development on airport land at Essendon Fields.

Scope of work included:

  • construction of 32,000m2 of pavements, including slip lanes and connections to Tullamarine Freeway;
  • 50,000m3 of bulk earthworks;
  • installation of over 1,100m of water and 740m of sewer reticulation
  • installation and connection of over 2,000m of storm water drainage, as well as retention basins, underground retention tanks and gross pollutant traps.

Challenges included overcoming drainage outfall issues on site, working to a tight delivery program, and the interface and management of residents, adjacent businesses and other project stakeholders such as VicRoads. The project team worked closely with the client to develop a cost effective solution to the drainage outfall on site, as well as a number of other design issues to ensure value for money and no delays to the construction program. This close relationship between Georgiou and Essendon Fields has seen successful progress to date, with the project on track to be completed by the end of 2015.

Reid Highway Upgrade

CLIENT:  MAIN ROADS WA
LOCATION:  BALCATTA, WA
DURATION:  JAN 2015 - MID 2016
CONTRACT VALUE:  65M

Georgiou has delivered the new Reid Highway Upgrade under a design and construct contract, valued at $65 million.

The project, which included works on the Reid Highway/Malaga Drive interchange and widening of Reid Highway between Duffy Road and Marmion Avenue, will significantly improve safety and traffic flow along Reid Highway in Balcatta, Carine and Malaga.

More than 21,200 vehicles a day use Reid Highway west of the freeway towards Marmion Avenue, and more than 30,000 vehicles a day use the highway east of the freeway.

Similarly, safety and efficiency at the intersection of Reid Highway and Malaga Drive has been boosted with two new bridges providing four lanes for Reid Highway traffic to flow uninterrupted over Malaga Drive. This means the 75,000 vehicles using this intersection each weekday will no longer have to wait for several traffic signal changes at peak periods and will experience better traffic flow in the area.

Construction work will commence mid-2015, with works completed by mid-2016.

Fast facts:

  • The Reid Hwy duplication works involve about 2.2km of carriageway duplication (between Erindale Rd and Duffy Rd) south of the existing Reid Hwy
  • It also includes a new loop ramp to allow traffic movements from Reid Hwy westbound to Mitchell Fwy northbound, a new bridge over Mitchell Fwy/railway line and upgrades to local intersections
  • It also includes improvements to the existing shared path over the existing Reid Hwy bridge (including a barrier to separate the path from vehicular traffic)
  • The Reid Hwy widening works involve about 2km of carriageway widening from Duffy Rd to Marmion Ave to provide two through lanes in each direction
  • The Reid Hwy/Malaga Dr Interchange works provides a four-lane freeway standard route on Reid Hwy over a four-lane arterial standard route on Malaga Dr
  • Dedicated bus lanes are included (requested by the PTA), and a Principal Shared Path will link to the existing PSP on Reid Hwy to Malaga Dr

Claremont on the Park Stage 3

CLIENT:  LANDCORP
LOCATION:  CLAREMONT, WA
DURATION:  MAR 2015 - MAR 2016
CONTRACT VALUE:  14M

Following the successful completion of Stages 1 and 2 of Claremont on the Park, Georgiou was awarded the Stage 3 in March 2015, valued at more than $14 million.

Scope of works includes remediation, clearing and earthworks, roadworks, landscape construction, installation of underground services, and removal and decommissioning of existing services.

Works are due for completion in March 2016.

 

Moorabbin Airport Precinct G

CLIENT:  MOORABBIN AIRPORT CORPORATION
LOCATION:  MOORABBIN AIRPORT, VIC
DURATION:  JAN 2015 - OCT 2015
CONTRACT VALUE:  4.3M

In November 2014, Georgiou were awarded a $4.3 million contract at the Moorabbin Airport in Victoria.

Scope of works included:

  • construction of building construction foundation pad for Costco warehouse;
  • demolition of existing buildings, concrete block dividing walls and hardstand, drainage infrastructure and removal of existing stockpiles;
  • site stripping and bulk earthworks;
  • construction of road and drainage works;
  • installation of sewerage and water reticulation works;
  • construction of retention basin and drainage outfall works; and
  • connection of electrical and telecommunication reticulation.

Key challenges on the project include dust management due to the close proximity of the works to local residents. Additionally, strong stakeholder management is required to ensure the public is kept up-to-date on works in an effort to keep disruption at a minimum. The team worked closely with the Client throughout the project to ensure no delays to the construction programme. The relationships between contractor and client/authority is considered key success to the project.

 

DEXUS Industrial Estate

CLIENT:  DEXUS FUND MANAGEMENT LTD
LOCATION:  TRUGANINA, VIC
DURATION:  SEPT 2014 - JUNE 2015
CONTRACT VALUE:  10.8M

In September 2014, Georgiou was awarded a $10 million design and construct industrial estate contract for DEXUS Fund Management in Truganina, Victoria.

Scope of works included:

  • management of design and construction works;
  • major earthworks including importation of 295,000m3 of fill;
  • approx. 30,000m2 of road construction, including interface with heavily trafficked Dohertys road;
  • 2.4km of stormwater drainage infrastructure, including large 2700mm Melbourne Water outfall drain;
  • largest gross pollutant trap in Victoria;
  • 1.8km water reticulation infrastructure;
  • 2.3km of sewerage infrastructure up to 6.5m deep; and
  • installation of electrical and communications infrastructure.

The scale of the project presented a few noteworthy challenges that where successfully managed:

  • water management – management of large flows through existing 2700mm pipeline during construction;
  • site traffic management – more than 600 truck movements every day importing fill material;
  • largest gross pollutant trap in Victoria, requiring an 11m deep excavation in rock and continuous dewatering; and
  • disposal of over 30,000T of excavated rock.

The team worked closely with the DEXUS, design consultants and relevant authorities (ie. Melbourne Water) throughout the project to ensure the design meets requirement and there are no delays to the construction programme. The close relationship between Georgiou, DEXUS and relevant authorities is considered a key to the success of the project.

Webb Dock Pre Delivery Inspection Hub

CLIENT:  PATRICK AUTOCARE
LOCATION:  WEBB DOCK, WEST MELBOURNE
DURATION:  MAY 2014 - AUG 2015
CONTRACT VALUE:  16M

In early 2014, Georgiou was awarded a $16 million contract for the design and construction of Patrick Autocare’s vehicle Pre Delivery Inspection Hub at Webb Dock - part of the Port of Melbourne’s Port Capacity Project.

Scope of work included:

  • Construction of over 100,000m2 of heavy and light duty asphalt pavements and concrete hardstands;
  • Design, construction and fit out of 10,000m2 processing facility and offices, as well as wash bays and refueling stations;
  • 120,000m3 of bulk earthworks; and
  • design and installation of drainage, water, sewer, lighting and security.
Challenges included overcoming design interface and regulatory requirements on site, working to a tight delivery program, interface with other contractors and operators, and the management of key stakeholders to the project.

Georgiou took a proactive and collaborative approach to stakeholder and design management, ensuring the client’s needs were addressed and achieved within budget and target timeframe. Our combined experience in civil and building construction meant that the best solutions and efficiencies for the whole of the project were realised, resulting in an exceptional outcome for the development.

Gateway WA

CLIENT:  MAIN ROADS WA
LOCATION:  PERTH, WA
DURATION:  MAR 2013 - APR 2016
CONTRACT VALUE:  900M

The iconic Gateway WA: Perth Airport and Freight Access Project is the largest infrastructure project ever undertaken by Main Roads WA.

In a consortium with Main Roads WA, Leighton Contractors, GHD, AECOM and BG&E, Georgiou has an 18% share in the design and construction of the Gateway WA Project.

Scope of works includes:

  • a major freeway-to-freeway interchange at Tonkin Highway-Leach Highway, including a new primary access road to the consolidated airport terminal,
  • a new interchange at Tonkin Highway-Horrie Miller Drive-Kewdale Road,
  • a new interchange at Leach Highway-Abernethy Road,
  • upgrading Leach Highway between Orrong Road and Tonkin Highway to an expressway standard and associated upgrades to local roads and intersections in the Kewdale area,
  • a principal shared path along Tonkin Highway and Leach Highway,
  • stage one of a new freeway-to-freeway interchange at Tonkin Highway-Roe Highway,
  • upgrading Tonkin Highway between Great Eastern Highway and Roe Highway to six lanes, and
  • a new interchange at Boud Avenue.

Calleya Estate

CLIENT:  STOCKLAND
LOCATION:  BANJUP, WA
DURATION:  OCT 2013 - ONGOING
CONTRACT VALUE:  10M

Georgiou is currently delivering multiple residential stages for Stockland at the Calleya Estate located adjacent to the nearby Cockburn Central Precinct.

Valued at more than $10 million, scope of works includes:

  • cut-to-fill operations with a total volume of more than 60,000m3;
  • cut-to-stockpile with a total volume ofmore than 150,000m3 for the future northern precinct;
  • remediation of uncontrolled fill in southern precinct totally more than 100,000m3 cut, replaced and compacted;
  • cut-to-fill and cut-to-stockpile operations for the Armadale Road and Fraser Road tie-in; and
  • civil works including roadworks, sewer reticulation, stormwater drainage, underground power, retaining walls and water reticulation.

Challenges faced on the project involved an additional 30,000m3 of uncontrolled fill discovered during operations, with several thousand cubic metres of cut-to-fill and cut-to-stockpile scope added during the project. As a consequence, civil stages 1-4 began whilst earthworks operations were undertaken on Armadale Road and surrounding stages. This presented a major challenge of site congestion and plant/personnel interaction.

Georgiou met the challenge by taking measures to exclude heavy plant haulage zones from civil crews and emphasizing the importance of site communication. Georgiou and labour hire personnel performed extremely well in this high-risk situation.

Additionally, the project has pockets of protected species including the Carnaby Black Cockatoo. This is communicated in induction stage so staff are aware of its presence. Additionally, Spider Orchid is located to the north of the project, which is fenced off and demarcated. When complete, this southern precinct will total approximately 465 lots.

Alkimos Estate

CLIENT:  LEND LEASE
LOCATION:  ALKIMOS, WA
DURATION:  OCT 2012 - ONGOING
CONTRACT VALUE:  35M

South Alkimos is a master planned project of approximately 2,200 lots located within the Perth north west corridor between Burns Beach and Yanchep with the first stages of development being between the coastline and Marmion Ave.

The development is currently on course to release an average of 200 lots per annum.

Scope of works include:

  • 30Ha of clearing and topsoil stripping; 520,000m3 cut-to-fill of sand and hard limestone rock material;
  • some 3,500 metres of sewer reticulation;
  • 2,500 linear metres of stormwater pipe work and associated drainage pits and sumps;
  • 2,900 linear metres of service trenching including water, gas, power, telecommunications and street lighting; and
  • 30,000m2 of pavement construction including road base, asphalt, and kerbing and associated footpaths.

Continuous forward planning of the works, site reviews and accessible haul routes were undertaken to generate a site material balance; resulting in no import fill or screening requirement in the earthworks required. Additionally, the project team is working closely with the engineer to ensure material balance is achieved over the earthworks and civil works is progressing despite design changes. To date, the best possible program has been achieved with earliest possible title date for the client.

 

 

Ellenbrook Estate

CLIENT:  LWP PROPERTY GROUP PTY LTD
LOCATION:  ELLENBROOK, WA
DURATION:  1995 - ONGOING
CONTRACT VALUE:  250M SINCE 1995

Ellenbrook is the largest residential estate in Western Australia which, upon completion, will yield 10,500 lots in eight distinct neighbourhoods. Georgiou was awarded the civil construction contract for all civil works.

Within a partnering environment, Georgiou is responsible for completing the earthworks; sewerage and drainage; road works; and retaining walls.

Works to date include:

  • bulk earthworks including clearing, topsoil stripping cut to fill and import fill operations;
  • installation of sewer mains up to 9 metres deep including installation and management of dewatering systems;
  • manufacture, supply and installation of stormwater drainage;
  • installation of services including PVC water main, PE gas main, power and communications conduit and pits;
  • construction of retailing walls including feature details; and
  • construction of roads, including pavement construction, asphalt wearing course, kerbing, footpaths and brick paving.

 

Davis & Sayers Road Intersection Upgrade

CLIENT:  STOCKLAND
LOCATION:  TARNEIT, VIC
DURATION:  OCT 2015 - JUL 2016
CONTRACT VALUE:  4.8M (exc. GST)

The project, completed in July 2016, involved upgrading the existing Davis and Sayers Road Intersection at Tarneit in Victoria.

Works included:

  • construction of a roundabout;
  • widened and additional turning lanes;
  • installation of under-road culverts for drainage and frog crossings;
  • landscaping and footpath construction.

Key challenges in the delivery of the project included working in close proximity to other contractors, management of local residents and stakeholders, complex construction staging and traffic management. The project team worked collaboratively with the client and local council to develop efficient and practical solutions to the construction staging, minimising impact on traffic and ensuring no delays to the program. Georgiou also made it a priority to engage with residents and adjacent development stakeholders to fully understand their needs and expectations, mitigating the risk of disruption to works.

The project was delivered within approved budget and program.

Sienna Wood Estate

CLIENT:  STOCKLAND
LOCATION:  HAYNES, WA
DURATION:  SEPT 2014 - APR 2018
CONTRACT VALUE:  30M

Georgiou has recently been awarded a second two year term contract with Stockland at Sienna Wood which will see works on the site up to mid-2018.

The award of the term contract was achieved off the back of the successful completion of three separate earthworks and 12 civil stages between September 2014 and July 2016. 

Scope of works includes:

  • clearing, stripping of topsoil and earthworks;
  • civil works including roadworks, sewer reticulation, stormwater drainage, underground power, retaining walls and water reticulatio;
  • any intersections required to the existing road network in the area;
  • civil works required to construct the town centre; and
  • construction of, and renovation to, the drainage network.

Challenges on the project include permit approvals and the low laying area on which the project is located, requiring Georgiou to adequately manage the dewatering and stormwater run-off from site. As part of the works, Georgiou is also required to meet multiple bonding and release dates for the civil stages and, to date, all works have been delivered on time – a testament to the team.

The team is working closely with the Client throughout the project to ensure there are no delays to the construction programme. Additionally, the team will look at cost-saving initiatives to assist with the future stages of the project ie. fill requirements