NSW Environmental Protection Licences

The NSW Protection of the Environment Operation Act 1997 requires holders of Environment Protection Licences (EPLs) to make pollution monitoring data required by the EPL publicly available. In addition, parts of the Pollution Incident Response Management Plan associated with the Environment Protection Licence (EPL) must be made publically available. These parts are outlined in the POEO Act under section 153C(a) and clause 98C(1)(h) and (i) or (2)(b) and (c).

Lendlease Communities (LLc) on behalf of a Works Authorisation Deed with Transport for NSW (TfNSW) are upgrading in stages the 5.4-kilometre Appin Road Upgrade Project between Mount Gilead in the south and the intersection with St Johns Road, Ambarvale to the north. Georgiou Group (Georgiou) has been contracted to deliver Stage 1 of the upgrade which is around 850 metres from the northern Mt Gilead subdivision intersection to the southern extent of Noorumba Reserve.  Georgiou holds the Environment Protection Licence (EPL 21788) for the project which falls under the scheduled activity of road construction >10km & <30km with the extraction of >=50,000 tonnes of material.

Monthly Monitoring Data

No licensed discharge points

EPL Premises Map – Appin Road, Gilead

Appin Road – EPL Premises Map

Pollution Incident Response Management Plan

Appin Road, Gilead – PIRMP

The proposed upgrade involves widening of about 3.2 km of Mona Vale Road between Manor Road / Lane Cove Road, Ingleside and Foley Street, Mona Vale. The upgrade would be from a two lane (one in each direction) undivided road to a four lane (two lanes in each direction) divided road. A component of the works requires the placement of virgin excavated natural material (VENM) spoil excavated from the Mona Vale Road East construction site, within a specific area of future Mona Vale Road West upgrade area. Georgiou holds EPL 21037 for road construction and land based extractive activities.

Monthly Monitoring Data

EPL Monitoring Data Record – Mona Vale Road East Upgrade

Pollution Incident Response Management Plan

Mona Vale Road East – PIRMP

The proposed project is to build a new 10.5 kilometre bypass of the Newell Highway. The Parkes Bypass will divert heavy vehicle traffic out of the Parkes town centre. It would be located about 1.5 to two kilometres west of the existing Newell Highway and would generally include one lane in each direction. The Parkes Bypass would depart from the existing Newell Highway to the south of Barkers Road and will re-join the highway to the north of Parkes near Maguire Road. Georgiou holds an Environment Protection Licence EPL 21473 for road construction 10km – 30km with the excavation of more than 50,000 tonnes of material.

Monthly Monitoring Data

EPL Monitoring Data Record – Newell Highway Upgrade – Parkes Bypass

EPL Premises Map – Newell Highway Upgrade – Parkes Bypass

EPL Premises Map – Newell Highway Upgrade – Parkes Bypass

Pollution Incident Response Management Plan

Newell Highway Upgrade – Parkes Bypass – PIRMP

Transport for NSW has appointed Georgiou Group Pty Ltd to deliver the Spring Farm Parkway Stage 1. The proposed project will provide a new four lane divided road extending about one kilometre connecting Menangle Road to Menangle Park Urban Release Area including an interchange over the Hume Motorway with City facing on and off ramps. Georgiou holds an Environment protection licence (EPL 21673) for road construction <10km with the excavation of >=50,000 tonnes of material.

Monthly Monitoring Data

EPL Monitoring Data Record – Spring Farm Parkway Stage 1

EPL Premises Map – Spring Farm Parkway Stage 1

EPL Premises Map – Spring Farm Parkway Stage 1

Pollution Incident Response Management Plan

Spring Farm Parkway Stage 1 – PIRMP

Community Agreement

Community Agreement Report – Phase 5 Out of Hours Works

Georgiou Group Pty Ltd are part of an Alliance with Transport for NSW, Daracon Contractors and SMEC Australia to deliver the Hexham Straight Widening Project . The proposal is to widen a six kilometre section of the Pacific Highway (Maitland Road) from four lanes to six lanes, starting a few hundred metres south of the intersection with the Newcastle Inner City Bypass at Sandgate, and extending through to about 800 metres north of Hexham Bridge, in Hexham, NSW. The Project will create two additional lanes, one in each direction, and will include replacing the existing bridge over Ironbark Creek. Georgiou holds an Environment protection licence (EPL 21804) on behalf of the Alliance for road construction <10km with the extraction of >=50,000 tonnes of material.

Water Quality Monitoring

Water Quality Monitoring – Hexham Straight Widening

EPL Premises Map – Hexham Straight Widening

EPL Premises Map – Hexham Straight Widening 

Pollution Incident Response Management Plan

Hexham Straight Widening – PIRMP

The project involved the upgrade of about 2 km of the New England Highway (HW9) at Bolivia Hill (the proposal), primarily to improve road safety. The proposal included building a bridge about 320 m long, and widening the road reserve to straighten out bends in the steepest section of the highway. Georgiou was transferred the EPL 21066 from RMS on the 12 October 2018. Condition M2 of the EPL requires Georgiou to monitor the concentration of total suspended solids, pH and visible oil and grease in waters discharged from sediment basins on the premises.

Monthly Monitoring Data

EPL Monitoring Data Record – New England Highway at Bolivia Hill

Pollution Incident Response Management Plan

New England Highway Upgrade at Bolivia Hill – PIRMP

The project involved the realignment of the Northern Road between Mersey Road and Eaton Road, Luddenham. The Georgiou and Ertech Joint Venture was awarded the contract and the  EPL 21121 was transferred to Georgiou from RMS on the 26 September 2018. Condition M2 of the EPL requires Georgiou to monitor the concentration of total suspended solids, pH and visible oil and grease in waters discharged from sediment basins on the premises.

Monthly Monitoring Data

EPL Monitoring Data Record – The Northern Road Upgrade, Mersey Road to Eaton Road

EPL 21121- Premises Map

EPL 21121 – Premises Map 

Pollution Incident Response Management Plan

The Northern Road – Mersey Road to Eaton Road – PIRMP

Georgiou commenced construction on behalf of RMS on the Northern Road Upgrade Stage 1 (between Old Northern Road and Peter Brock Drive, Narellen) in February 2016. Georgiou holds EPL No 20561 for the road construction of the Northern Road Upgrade Stage 1. Condition M2 of the EPL requires Georgiou to monitor the concentration of total suspended solids, pH and visible oil and grease in waters discharged from sediment basins on the premises.

Monthly Monitoring Data

EPL Monitoring Data Record – The Northern Road Upgrade Stage 1

Pollution Incident Response Management Plan

The Northern Road Stage 1 – PIRMP

The project involves the construction of a new 2.71km 2-lane single carriageway section on the Newell Highway at Grong Grong, 20.34km north of Narrandera in NSW. Georgiou was transferred the EPL 20719 fromRMS on the 30 November 2016. Condition M2 of the EPL requires Georgiou to monitor the concentration of total suspended solids, pH and visible oil and grease in waters discharged from sediment basins on the premises.

Monthly Monitoring Data

EPL Monitoring Data Record – Newell Highway Curve Realignment

Pollution Incident Response Management Plan

Grong Grong – PIRMP