Georgiou delivered eight, 41-metre Tee-Roff bridge beams and Mechanically Stabilised Earth (MSE) panels for the Russell Road Upgrade Project in Perth’s south.

Manufactured in 10 weeks, the team utilised their in-ground stressing bed (80m x 6.25m x 2.5m) which can produce beams in excess of 300 tonnes and up to 66 metres in length, if required.

Each Tee-Roff beam weighed 191 tonnes each and the project saw 55 personnel at peak.

Georgiou delivered the beams as part of the $105 million Aubin Grove Train Station project.