WHITBY PUMP STATION

Georgiou completed the installation of a Type 10 Whitby Pump Station and pressure main at the Whitby Estate for client, Gold Fusion, in early 2016.

Image for WHITBY PUMP STATION

Client

Gold Fusion

Location

Whitby Western Australia 6123, Australia

Duration

Jun 2015 - Jan 2016

Cost

$3.5 million

Georgiou completed the installation of a Type 10 Whitby Pump Station and pressure main at the Whitby Estate for client, Gold Fusion, in early 2016.

Scope of works included:

  • construction of approximately 5,315 m of OD180 PN12.5 PE100 pressure main from the temporary pumping station, running north through the development, a rail reserve and then along Soldiers Road;
  • construction of approximately 312 m of OD225 PN12.5 PE100 pressure main;
  • installation of associated valves and fittings necessary to direct wastewater through the modified network under normal operation and maintenance or emergency scenarios;
  • installation of a new Type 10 pumping station at the Whitby development to pump 13–16 L/s to existing access chamber AC8984 and installation of a new magnetic flowmeter, valves and discharge pipework associated with the pumping station; and
  • installation of a below ground passive odour control system at the pumping station.