HOTA GREEN BRIDGE

Georgiou delivered the City of Gold Coast’s The Green Bridge project in a joint venture with Brady Marine and Civil in early 2020.

Image for HOTA GREEN BRIDGE

Client

City of Gold Coast

Location

Surfers Paradise Queensland 4217, Australia

Duration

Nov 2018 - Feb 2020

Cost

$19.5 million

Georgiou delivered the City of Gold Coast’s The Green Bridge project in a joint venture with Brady Marine and Civil in early 2020.

The Green Bridge project includes the design and construction of a 130-metre long, 5-metre wide pedestrian and cycle link to connect Home of the Arts (HOTA) to Chevron Island and provide a gateway between the precinct and Surfers Paradise.

The bridge features a J-curve landing over Evandale Lake with a striking 3D façade entitled 40 Million Mornings  with informal seating and space for pop-up food carts or performers.

Awards:

  • 2021 Qld Civil Contractors Federation (CCF) Earth Award in the $10-$30 million category.