HOTA GREEN BRIDGE
Georgiou delivered the City of Gold Coast’s The Green Bridge project in a joint venture with Brady Marine and Civil in early 2020.

Client
City of Gold Coast
Location
Surfers Paradise Queensland 4217, Australia
Duration
Nov 2018 - Feb 2020
Cost
$19.5 million
Georgiou delivered the City of Gold Coast’s The Green Bridge project in a joint venture with Brady Marine and Civil in early 2020.
The Green Bridge project includes the design and construction of a 130-metre long, 5-metre wide pedestrian and cycle link to connect Home of the Arts (HOTA) to Chevron Island and provide a gateway between the precinct and Surfers Paradise.
The bridge features a J-curve landing over Evandale Lake with a striking 3D façade entitled 40 Million Mornings with informal seating and space for pop-up food carts or performers.
Awards:
- 2021 Qld Civil Contractors Federation (CCF) Earth Award in the $10-$30 million category.