RUSSELL ROAD BRIDGE BEAMS
In June 2016, Georgiou delivered eight, 41-metre Tee-Roff bridge beams and Mechanically Stabilised Earth (MSE) panels for the Russell Road Upgrade Project in Perth's south.

Client
Main Roads WA
Location
Hazelmere Western Australia 6055, Australia
Duration
Mar 2016 - Jun 2016
Cost
NFP
Georgiou delivered eight, 41-metre Tee-Roff bridge beams and Mechanically Stabilised Earth (MSE) panels for the Russell Road Upgrade Project in Perth’s south.
Manufactured in 10 weeks, the team utilised their in-ground stressing bed (80m x 6.25m x 2.5m) which can produce beams in excess of 300 tonnes and up to 66 metres in length, if required.
Each Tee-Roff beam weighed 191 tonnes each and the project saw 55 personnel at peak.
Georgiou delivered the beams as part of the $105 millionĀ Aubin Grove Train Station project.