Our Commitment

Georgiou is committed to minimising, where reasonably practicable, our impact on the natural environment and social surroundings for the benefit of current and future generation. This includes respecting communities; protection of cultural heritage sites; protection of flora, fauna and associated habits; diversion of waste from landfill and pollution prevention.

For more on our environmental commitment, click here.

Environmental Monitoring

The Protection of the Environment Operation Act 1997 requires holders of Environment Protection Licences (EPLs) to make pollution monitoring data required by the EPL publicly available. In addition, parts of the Pollution Incident Response Management Plan associated with the Environment Protection Licence (EPL) must be made publically available. These parts are outlined in the POEO Act under section 153C(a) and clause 98C(1)(h) and (i) or (2)(b) and (c).

Mona Vale Road East Upgrade

The proposed upgrade involves widening of about 3.2 km of Mona Vale Road between Manor Road / Lane Cove Road, Ingleside and Foley Street, Mona Vale. The upgrade would be from a two lane (one in each direction) undivided road to a four lane (two lanes in each direction) divided road. A component of the works requires the placement of virgin excavated natural material (VENM) spoil excavated from the Mona Vale Road East construction site, within a specific area of future Mona Vale Road West upgrade area. Georgiou holds EPL 21037 for road construction and land based extractive activities. There is currently no requirement for a monthly pollution monitoring summary for this licence as there are no licenced discharge points on the EPL.

Pollution Incident Response Management Plan

Mona Vale Road East – PIRMP

New England Highway at Bolivia Hill

The project involves the upgrade of about 2 km of the New England Highway (HW9) at Bolivia Hill (the proposal), primarily to improve road safety.  The proposal includes building a bridge about 320 m long, and widening the road reserve to straighten out bends in the steepest section of the highway. Georgiou was transferred the EPL 21066 from RMS on the 12 October 2018. Condition M2 of the EPL requires Georgiou to monitor the concentration of total suspended solids, pH and visible oil and grease in waters discharged from sediment basins on the premises.

Monthly Monitoring Data

EPL Monitoring Data Record – New England Highway at Bolivia Hill

Pollution Incident Response Management Plan

New England Highway Upgrade at Bolivia Hill – PIRMP

Northern Road Upgrade – Mersey Road to Eaton Road

The project involves the realignment of the Northern Road between Mersey Road and Eaton Road, Luddenham. The Georgiou and Ertech Joint Venture has been awarded the contract and the  EPL 21121 was transferred to Georgiou from RMS on the 26 September 2018. Condition M2 of the EPL requires Georgiou to monitor the concentration of total suspended solids, pH and visible oil and grease in waters discharged from sediment basins on the premises

Monthly Monitoring Data

EPL Monitoring Data Record – Northern Road Upgrade, Mersey Road to Eaton Road

EPL 21121- Premises Map

EPL 21121 – Premises Map 

Pollution Incident Response Management Plan

Northern Road – Mersey Road to Eaton Road – PIRMP

Northern Road Upgrade – Stage 1

Georgiou commenced construction on behalf of RMS on the Northern Road Upgrade Stage 1 (between Old Northern Road and Peter Brock Drive, Narellen) in February 2016. Georgiou holds EPL No 20561 for the road construction of the Northern Road Upgrade Stage 1. Condition M2 of the EPL requires Georgiou to monitor the concentration of total suspended solids, pH and visible oil and grease in waters discharged from sediment basins on the premises.

Monthly Monitoring Data

EPL Monitoring Data Record – Northern Road Upgrade Stage 1 

Pollution Incident Response Management Plan

Northern Road Stage 1 – PIRMP

Newell Highway Curve Realignment – Grong Grong

The project involves the construction of a new 2.71km 2-lane single carriageway section on the Newell Highway at Grong Grong, 20.34km north of Narrandera in NSW. Georgiou was transferred the EPL 20719 from RMS on the 30 November 2016. Condition M2 of the EPL requires Georgiou to monitor the concentration of total suspended solids, pH and visible oil and grease in waters discharged from sediment basins on the premises.

Monthly Monitoring Data

EPL Monitoring Data Record – Newell Highway Curve Realignment

Pollution Incident Response Management Plan

Grong Grong – PIRMP