TONKIN GAP
As part of the Tonkin Gap Alliance, Georgiou Group - in alliance with Main Roads Western Australia, Public Transport Authority, BMD, WA Limestone, BG&E and GHD - will deliver the $400 million Tonkin Gap project.

Client
Main Roads WA
Location
Bayswater Western Australia 6053, Australia
Duration
2020 - 2023
Cost
$290 million
As part of the Tonkin Gap Alliance, Georgiou Group – in alliance with Main Roads Western Australia, Public Transport Authority, BMD, WA Limestone, BG&E and GHD – will deliver the $400 million Tonkin Gap project.
The Tonkin Gap Project will address the current bottleneck where the highway reduces from three lanes to two in Bayswater and Redcliffe, significantly reducing travel times and improving safety.
The Associated Works will provide rail-enabling works for the METRONET Morley-Ellenbrook Line along Tonkin Highway, including underpasses and dive structures, to enable trains to enter and travel along the median of Tonkin Highway then exit in Malaga.
Scope of works for the project include:
- additional traffic lanes in each direction between Collier Road and Dunreath Drive;
- new bridges over the Swan River, Guildford Road, Railway Parade, the Midland Line railway and Dunstone Road;
- upgrades to the Guildford Road and Great Eastern Highway interchanges;
- a Principal Shared Path with bridges, underpasses and local connections for cyclists and pedestrians; and
- noise walls, lighting and amenity improvements.
Works are currently underway with completion scheduled for 2023.